Skip to product information
Ice Scoop, Heavy Duty Cast Aluminum, Ergonomic S-Curve Handle, Commercial Grade for Ice, Coffee, Popcorn, Flour, Sugar, Food-Grade & Rust-Proof Kitchen Tool (L (24oz)) - size: L (24oz)
$12.94
Sale price
$12.94
Regular price
About this item
- Commercial-Grade & Unbreakable Say goodbye to flimsy, rusting scoops! Crafted from heavy-duty cast aluminum, this ice scoop offers superior strength and is naturally rust-proof. It won't crack, chip, or corrode, ensuring a lifetime of reliable use in your kitchen or business.
- Ergonomic S-Shape Handle for Comfort Our innovative curved handleis designed for all-day comfort. The sleek S-curve fits perfectly in your palm, reducing wrist strain. Whether you're a barista in a rush or portioning pet food, experience effortless scooping with no hand fatigue.
- No-Spill Design & Sharp, Thin Edge Master the pour! This scoop features a no-spill design for clean, controlled dispensing from ice machines or bulk bins. The precision-thinned edge easily slips into tight corners of bags and containers, grabbing every last coffee bean or grain.
- Seamless & Easy-Clean Construction Enjoy hassle-free cleanup! The one-piece, seamless design has no cracks or crevices for food to get stuck. Its smooth, polished surface resists residue. A quick rinse is all it needs – simply hand wash and dry for spotless, sanitary storage.
- Ultimate Multi-Purpose Kitchen Tool Your go-to scoop for everything! From ice cubes, coffee beans, and popcorn to flour, candy, and pet food. With a thickened, sturdy build, it effortlessly handles heavy items like large ice blocks and bulk grains. A true all-in-one workhorse.
Overview
- Color: stainless steel color
- Material: Aluminum
- Brand: BUBBLE-FLY
- Item Weight: 9.07 g
- Unit Count: 1 Count